Eastern State Penitentiary
One of the badly rusted cell block roofs
This is a shot of the same roof after it was restored using one primer coat of 10-520 roof primer and two coats of Showerproof "WB"
A repair was made 6 months before using new Terne metal. The welded seams had begun to rust.
Rusted seams were spot primed with 10-520 primer and the roof was finished with 2 coat of Showerproof "WB"
New Terne on turrett rusted before it was painted.
The turrett was repaired using 10-520 rust inhibitive primer and two coat of Showerproof "WB".